Sierra Business Park | Industrial Project

Anywhere and Everywhere

Corbis’s client-centric style allows its specialists to tailor solutions that meet clients’ needs, while balancing the nuances and specific project contexts.

Anywhere and Everywhere

Corbis’s client-centric style allows its specialists to tailor solutions that meet clients’ needs, while balancing the nuances and specific project contexts.

The Project: Sierra Business Park

Project Description

The project consists of three, LEED-certified buildings at Sierra Business Park for Oakmont Industrial Group. buildings: - Building F: 107712 sqft - Building E: 14202 sqft - Building D: 308325 sqft The two new buildings are built adjacent to the three large warehouse structures Oltmans constructed in 2005-2006. The buildings are type V-B, fully sprinklered, “shell” warehouse buildings with each including two trash enclosures, light standards, screen walls, and site work

Scope of work

CorbisStudio Scope of Work: Schematic Design and Construction Drawings using AutoCAD and Revit BIM Models

Related work

project

Mystic Lake

Hospitality, United States

project

Wynn Dev

Casinos, United States

project

Pelican Point

Hospitality, Turks and Caicos Islands

LOCATION

Fontana

California United States

AREA




FACT #04

BIM is now a reliable and trusted resourcethat should be an integrated into a development team’s toolbox. Developers benefit from opportunities to bring projects to market quicker and with reduced costs because of design delivery delays and costly change orders.


The Corbis Way

The devil is in the details. With over 20 years of experience and a foundation based on smart sequence and actions, areas of expertise, methods and templates, we provide true value for our clients, every step of the way.

GET IN TOUCH